Houston Ship Channel aeration project. Technical Memorandum #8. Summary of work performed through February 15, 1987.

dc.acquisition-srcen_US
dc.call-noSPEC COLL GBAY Acc# 4970en_US
dc.contract-noen_US
dc.contributor.authorEspey, Huston & Associates, Incorporateden_US
dc.contributor.authorPate Engineers, Incorporateden_US
dc.contributor.otheren_US
dc.date.accessioned2010-02-15T17:11:26Z
dc.date.available2010-02-15T17:11:26Z
dc.date.issued1987en_US
dc.degreeen_US
dc.description60 p.en_US
dc.description-otheren_US
dc.description.abstractThis progress report describes Phase II instream aeration project activities performed during the period November 15, 1986 through February 15, 1987. The first part of the report addresses conceptual design and estimates of capital and operating costs for an instream jet aeration system. Conceptual design of seven standard land-based stationary modules transferring oxygen from 1,500 lbs/day to 18,000 lbs/day has been completed. At the time of the report, 12 potential sites had been identified for possible placement of instream aeration facilities. Criteria for site selection was defined and investigation of the suitability of these sites was begun. The second part of this report was prepared by Hydroqual, a subcontractor to the Venture. An assessment of the aeration capacity requirements for the Houston Ship Channel using a two-layer, steady state model was provided in this section of the report. The aeration needs determined by Hydroqual were in close agreement with those defined earlier by the Venture and documented in Technical Memorandum #7, published November 15, 1986.en_US
dc.description.urihttp://gbic.tamug.edu/request.htmen_US
dc.geo-codeHouston Ship Channelen_US
dc.historyen_US
dc.identifier.urihttp://hdl.handle.net/1969.3/22646
dc.latitudeen_US
dc.locationGBIC Special Collectionen_US
dc.longitudeen_US
dc.notesen_US
dc.place[Austin, Texas] -en_US
dc.publisherEspey, Huston & Associates, Incorporated and Pate Engineers, Incorporateden_US
dc.relation.ispartofseries4970.00en_US
dc.relation.urien_US
dc.scaleen_US
dc.seriesen_US
dc.subjectaerationen_US
dc.subjectoxygenationen_US
dc.subjectwater treatmenten_US
dc.subjectwater qualityen_US
dc.titleHouston Ship Channel aeration project. Technical Memorandum #8. Summary of work performed through February 15, 1987.en_US
dc.typeBooken_US
dc.universityen_US
dc.vol-issueen_US

Files