Trans-Texas Water Program: southeast area: draft memorandum report: projected water needs and supply of the Upper Neches and Sabine River basins

dc.acquisition-srcen_US
dc.call-noTD 224 .T4 P76 1997 GBAYen_US
dc.contract-noen_US
dc.contributor.otheren_US
dc.date.accessioned2010-02-15T17:19:01Z
dc.date.available2010-02-15T17:19:01Z
dc.date.issued1997en_US
dc.degreeen_US
dc.description58 pgs.en_US
dc.description-otheren_US
dc.description.abstractThe scope of work for Phase II of the TTWP studies includes an examination of the projected water requirements of the upper Neches and Sabine Basins through the year 2050, to determine whether those areas are likely to need any of the supply available from the Southeast Area. The wording for that task in the scope of work is reproduced in Appendix B. The methods and results of that analysis are described in this report.en_US
dc.description.urihttp://gbic.tamug.edu/request.htmen_US
dc.geo-codeTexasen_US
dc.geo-codeGalveston Bayen_US
dc.geo-codeSabine Riveren_US
dc.geo-codeSan Jacinto Riveren_US
dc.geo-codeTrinity Riveren_US
dc.geo-codeBrazos Riveren_US
dc.geo-codeNeches Riveren_US
dc.history3/27/06 easen_US
dc.identifier.urihttp://hdl.handle.net/1969.3/23711
dc.latitudeen_US
dc.locationGBIC Circulating Collectionen_US
dc.longitudeen_US
dc.notesSeptember 1997en_US
dc.placeFt. Worth, TXen_US
dc.publisherFreese & Nichols, Inc.en_US
dc.relation.ispartofseries5138.00en_US
dc.relation.urien_US
dc.scaleen_US
dc.seriesen_US
dc.subjectUpper nechesen_US
dc.subjectsabine riveren_US
dc.subjectwateren_US
dc.subjectwater qualityen_US
dc.subjectwater supplyen_US
dc.subjectwater resources developmenten_US
dc.subjectenvironmental impactsen_US
dc.subjectwater needsen_US
dc.titleTrans-Texas Water Program: southeast area: draft memorandum report: projected water needs and supply of the Upper Neches and Sabine River basinsen_US
dc.typeBooken_US
dc.universityen_US
dc.vol-issueen_US

Files