Suspended-sediment load of Texas streams: compilation report October 1975 - September 1982

dc.acquisition-srcJ. McKinney, Texas Water Commission, Publications Dept., Austin, Texas; Review of GBNEP-15 reference listen_US
dc.call-noTD 224 .T4 A333 no.306 GBAYen_US
dc.contract-noen_US
dc.contributor.authorQuincy, R.M.en_US
dc.contributor.otheren_US
dc.date.accessioned2010-02-15T17:06:12Z
dc.date.available2010-02-15T17:06:12Z
dc.date.issued1988en_US
dc.degreeen_US
dc.description151 pgs.en_US
dc.description-otheren_US
dc.description.abstractDuring the period covered by this report 40 suspended-sediment sampling stations were operated. Suspended-sediment sampling stations operated by the Texas Water Development Board at or near streamflow-measuring stations use streamflow records collected by the U.S. Geological Survey in the determination of estimated suspended-sediment loads.en_US
dc.description.urihttp://gbic.tamug.edu/request.htmen_US
dc.geo-codeTexas coasten_US
dc.history8/26/05 eas; 3/16/05 easen_US
dc.identifier.urihttp://hdl.handle.net/1969.3/21846
dc.latitudeen_US
dc.locationGBIC Circulating Collectionen_US
dc.longitudeen_US
dc.notesJuly 1988en_US
dc.placeAustin, TXen_US
dc.publisherTexas Water Development Boarden_US
dc.relation.ispartofseries4041.00en_US
dc.relation.urien_US
dc.scaleen_US
dc.seriesTexas Water Development Board Report 306en_US
dc.subjectstreamsen_US
dc.subjectsediment loaden_US
dc.subjectsuspended particulate matteren_US
dc.subjectturbidityen_US
dc.subjectriversen_US
dc.subjectenvironmental aspectsen_US
dc.titleSuspended-sediment load of Texas streams: compilation report October 1975 - September 1982en_US
dc.typeBooken_US
dc.universityen_US
dc.vol-issueen_US

Files