Galveston Bay field nears production start
dc.acquisition-src | Downloaded from-Web of Science | en_US |
dc.call-no | en_US | |
dc.contract-no | en_US | |
dc.contributor.author | [Anon] | en_US |
dc.contributor.editor | en_US | |
dc.contributor.other | Oil & Gas Journal | en_US |
dc.date.accessioned | 2010-02-15T17:17:19Z | |
dc.date.available | 2010-02-15T17:17:19Z | |
dc.date.issued | 1998 Mar 30 | en_US |
dc.degree | en_US | |
dc.description | 80-80 | en_US |
dc.description-other | en_US | |
dc.description.abstract | TransTexas Gas Corp. and Davis Petroleum Corp. are taking steps to start gas production from Eagle Point gas/condensate field in Galveston Bay. The companies said the 3 State Tract 331 confirmation well flowed at a rate of 41 MMcfd of gas and 10,700 b/d of condensate with 3,750 psi FTP. | en_US |
dc.description.uri | http://gbic.tamug.edu/request.htm | en_US |
dc.geo-code | en_US | |
dc.history | en_US | |
dc.identifier.uri | http://hdl.handle.net/1969.3/23475 | |
dc.latitude | en_US | |
dc.location | en_US | |
dc.longitude | en_US | |
dc.notes | Times Cited: 0ArticleEnglishCited References Count: 0ZF8491421 S SHERIDAN RD PO BOX 1260, TULSA, OK 74101 USATULSA | en_US |
dc.place | en_US | |
dc.publisher | en_US | |
dc.relation.ispartofseries | 51121.00 | en_US |
dc.relation.uri | en_US | |
dc.scale | en_US | |
dc.series | en_US | |
dc.subject | Natural gas industry, Offshore, Natural gas, Industrial production | en_US |
dc.title | Galveston Bay field nears production start | en_US |
dc.type | Journal | en_US |
dc.university | en_US | |
dc.vol-issue | 96(13) | en_US |