Concrete box girder sets U.S. record

dc.acquisition-srcDownloaded from-Engineering Village 2en_US
dc.call-noen_US
dc.contract-noen_US
dc.contributor.authorAnonen_US
dc.contributor.otheren_US
dc.date.accessioned2010-02-15T17:15:46Z
dc.date.available2010-02-15T17:15:46Z
dc.date.issued1983en_US
dc.degreeen_US
dc.description115-116en_US
dc.description-otheren_US
dc.description.abstractThe paper reports on the design and construction of a post-tensioned highway bridge that spans 750 feet over busy Houston, Texas Ship Channel. The center span is flanked by two 375-foot spans to create a 1500-foot main structure, which forms part of a 4. 2-mile link between two major highways east of Houston. Strand tendons were used for vertical and transverse prestress instead of post-tensioning barsen_US
dc.description.urihttp://gbic.tamug.edu/request.htmen_US
dc.historyen_US
dc.identifier.urihttp://hdl.handle.net/1969.3/23255
dc.latitudeen_US
dc.locationen_US
dc.longitudeen_US
dc.notesCompilation and indexing terms, Copyright 2004 Elsevier Engineering Information, Incen_US
dc.placeen_US
dc.publisheren_US
dc.relation.ispartofseries50840.00en_US
dc.relation.urien_US
dc.scaleen_US
dc.seriesen_US
dc.subjectBRIDGES,BOX GIRDER - Constructionen_US
dc.subjectBRIDGES,HIGHWAYen_US
dc.subjectConstructionen_US
dc.subjectTexasen_US
dc.titleConcrete box girder sets U.S. recorden_US
dc.typeJournalen_US
dc.universityen_US
dc.vol-issue28(2)en_US

Files