Depart of Army permit application nos. 10400, 13576, 13577, 13578, 13579 by Board of Trustees, Galveston Wharves and Pelican Terminal Corporation to construct a multipurpose deepwater port and crude oil distribution system at Galveston, Texas. Final environmental impact statement. Volumes 1 and 2.

dc.acquisition-srcHerman Rudenbergen_US
dc.call-noHE554.G3 F54 v.1-2en_US
dc.call-noHE554.G3 F54 v.1-2en_US
dc.call-noARCHIVE HE554.G3 F54 v.1-2en_US
dc.contract-noen_US
dc.contributor.authorU.S. Army Corps of Engineers, Galveston Districten_US
dc.contributor.otheren_US
dc.date.accessioned2010-02-15T16:59:54Z
dc.date.available2010-02-15T16:59:54Z
dc.date.issued1979en_US
dc.degreeen_US
dc.descriptionARCHIVAL MATERIAL. Vol. 1, 494 p.; Vol. 2, 338 p.en_US
dc.description-otheren_US
dc.description.abstractThe proposed onshore deepwater port project would involve deepening the existing ship channel into Galveston and extending the channel further into the Gulf of Mexico. Also proposed is the construction of a crude oil pipeline distribution system, originating at Pelican Island, and an oil storage tank farm. This statement assesses ecological, social, and economic impacts expected to result from the proposed project. Included in the analysis are discussions regarding possible means of reducing the detrimental impacts expected to result from the proposed project. Included in the analysis are discussions regarding possible means of reducing the detrimental impacts, including mitigative measures. Various alternatives to the proposed project are also discussed.en_US
dc.description.urihttp://gbic.tamug.edu/request.htmen_US
dc.geo-codePelican Islanden_US
dc.geo-codeNorthwestern Gulf of Mexicoen_US
dc.geo-codeGalveston Channelen_US
dc.geo-codeGalveston Islanden_US
dc.historyen_US
dc.identifier.urihttp://hdl.handle.net/1969.3/20825
dc.latitudeen_US
dc.locationTAMUG circulating collection; Galveston Bay Collection; Galveston Bay Collectionen_US
dc.longitudeen_US
dc.notesCall the Galveston Bay office at 409/740-4703 to arrange for use of this archive collection.en_US
dc.placeGalveston, Texasen_US
dc.publisherU.S. Army Corps of Engineers, Galveston District.en_US
dc.relation.ispartofseries3016.00en_US
dc.relation.urien_US
dc.scaleen_US
dc.seriesen_US
dc.subjectdeep-water terminalsen_US
dc.subjectcrude oilen_US
dc.subjectpipelinesen_US
dc.subjectenvironmental impacten_US
dc.subjectport installationsen_US
dc.subjectport developmenten_US
dc.subjectdredgingen_US
dc.subjectconstructionen_US
dc.subjectship canalsen_US
dc.subjecteconomic analysisen_US
dc.subjecthydrographyen_US
dc.titleDepart of Army permit application nos. 10400, 13576, 13577, 13578, 13579 by Board of Trustees, Galveston Wharves and Pelican Terminal Corporation to construct a multipurpose deepwater port and crude oil distribution system at Galveston, Texas. Final environmental impact statement. Volumes 1 and 2.en_US
dc.typeBooken_US
dc.universityen_US
dc.vol-issueen_US

Files