Instrumentation for Engineering Management of a Multi-Purpose River Basin System (Trinity River Basin, Texas). Real-Time Engineering Management of a Multi-Purpose River Basin System
dc.acquisition-src | Downloaded from-National Technical Information Service | en_US |
dc.call-no | en_US | |
dc.contract-no | en_US | |
dc.contributor.author | Martin QW | en_US |
dc.contributor.author | Lesso WG | en_US |
dc.contributor.author | Gloyna EF | en_US |
dc.contributor.other | en_US | |
dc.date.accessioned | 2010-02-15T17:11:59Z | |
dc.date.available | 2010-02-15T17:11:59Z | |
dc.date.issued | 1973 | en_US |
dc.degree | en_US | |
dc.description | - | en_US |
dc.description-other | en_US | |
dc.description.abstract | An algorithm was developed for finding the optimal management policies for the dynamic operation of a system of mulitpurpose reservoirs, tertiary wastewater treatment plants, wastewater retention basins, and navigation locks and dams. This management procedure is designed to interface with a real-time water quality monitoring system so that operating policies can be adjusted to reflect changing environmental conditions. The Trinity River Basin in Texas was selected as an example system for specific recommendations | en_US |
dc.description.uri | http://gbic.tamug.edu/request.htm | en_US |
dc.history | en_US | |
dc.identifier.uri | http://hdl.handle.net/1969.3/22726 | |
dc.latitude | en_US | |
dc.location | en_US | |
dc.longitude | en_US | |
dc.notes | Source Performer: Texas Univ., Austin. Center for Research in Water Resources. Dec 1973. 236p. Report: CRWR-98; W7407369,; OWRRB-079-TEX(2)Agency W74; OWRREnglishCountry of Origin United StatesFinal rept | en_US |
dc.place | en_US | |
dc.publisher | en_US | |
dc.relation.ispartofseries | 50061.00 | en_US |
dc.relation.uri | en_US | |
dc.scale | en_US | |
dc.series | en_US | |
dc.subject | 48B Natural Resources & Earth Sciences: Natural Resource Management | en_US |
dc.subject | 68D Environmental Pollution & Control: Water Pollution & Control | en_US |
dc.subject | Algorithms | en_US |
dc.subject | Basins | en_US |
dc.subject | Instrumentation | en_US |
dc.subject | Management | en_US |
dc.subject | Monitoring | en_US |
dc.subject | Multiple purpose reservoirs | en_US |
dc.subject | Navigation | en_US |
dc.subject | Operation | en_US |
dc.subject | Optimization | en_US |
dc.subject | Plants | en_US |
dc.subject | Policies | en_US |
dc.subject | Quality | en_US |
dc.subject | Real time | en_US |
dc.subject | Real time operations | en_US |
dc.subject | Recommendations | en_US |
dc.subject | Reservoirs | en_US |
dc.subject | River Basins | en_US |
dc.subject | Systems analysis | en_US |
dc.subject | Texas | en_US |
dc.subject | Trinity River | en_US |
dc.subject | Trinity River Basin | en_US |
dc.subject | United States | en_US |
dc.subject | Water | en_US |
dc.subject | Water pollution abatement | en_US |
dc.subject | Water quality | en_US |
dc.subject | Water resources | en_US |
dc.title | Instrumentation for Engineering Management of a Multi-Purpose River Basin System (Trinity River Basin, Texas). Real-Time Engineering Management of a Multi-Purpose River Basin System | en_US |
dc.type | Report | en_US |
dc.university | en_US | |
dc.vol-issue | Contract DI-14-31-0001-3337; Proj. OWRR-B-079-TEX() | en_US |