Galveston Bay Houston Ship Channel project, calculation of project impact, TAMU/ODU oyster population dynamics model

dc.acquisition-srcen_US
dc.call-noTD 194.66 .T42 G34 GBAYen_US
dc.call-noTD 194.66 .T42 G34en_US
dc.contract-noen_US
dc.contributor.authorPowell, Eric N.en_US
dc.contributor.authorKlinck, J.M.en_US
dc.contributor.authorHofmann, E.E.en_US
dc.contributor.authorDekshenieks, M.M.en_US
dc.contributor.authorWilson-Ormond, E.A.en_US
dc.contributor.authorEllis, M.S.en_US
dc.contributor.otheren_US
dc.date.accessioned2010-02-15T17:36:29Z
dc.date.available2010-02-15T17:36:29Z
dc.date.issued1995en_US
dc.degreeen_US
dc.description344 pgs.en_US
dc.description-otheren_US
dc.description.abstractThis document describes the procedure used to estimate the impact of the enlargement of the Houston Ship Channel on the oyster populations of Galveston Bay over a 50 year period from 1999 to 2049. The impacts are calculated from simulations using the TAMU/ODU population dynamics model coupled to the WES hydrodynamics model under three hydrologies, present, 2024, and 2049, and under three freshwater inflow regimes, low, mean and high flow. The impacts have been calculated using two simulation strategies. One uses a standard simulation of the oyster population dynamics model and one uses a reduced level of low-salinity mortality. The rationale for the second simulation using a reduced level of low-salinity mortality is described in reports accompanying the results of the simulation. The estimates of impacts are calculated using oyster distribution in Galveston Bay derived from two data sets, one from Galveston Bay National Estuary Program (GBNEP) health assessment and one from the Texas Parks and Wildlife Department (TPWD) stock assessment program. A comparison of impact estimates was made using these two data sets. A description of each of the steps in the procedure used to estimate the impact of channel enlargement is included as well as the data underlying the calculations presented in tabular form.en_US
dc.description.urihttp://gbic.tamug.edu/request.htmen_US
dc.geo-codeGalveston Bayen_US
dc.geo-codeHouston Ship Channelen_US
dc.history7/27/07 easen_US
dc.identifier.urihttp://hdl.handle.net/1969.3/26106
dc.latitudeen_US
dc.locationGBIC Circulating Collection; TAMUG Circulating Collectionen_US
dc.longitudeen_US
dc.notesDecember 5, 1994; revised January 9, 1995en_US
dc.placeGalveston, TXen_US
dc.publisherU.S. Army Corps of Engineers, Galveston Districten_US
dc.relation.ispartofseries9021.00en_US
dc.relation.urien_US
dc.scaleen_US
dc.seriesen_US
dc.subjectenvironmenten_US
dc.subjectenvironmental factorsen_US
dc.subjectoyster fisheriesen_US
dc.subjectpopulation dynamicsen_US
dc.subjectenvironmental effectsen_US
dc.subjectdredgersen_US
dc.subjectdredgesen_US
dc.subjectenvironmental impact analysisen_US
dc.subjectenvironmental aspectsen_US
dc.subjectdredgingen_US
dc.subjectenvironmental conditionsen_US
dc.subjecthouston ship channelen_US
dc.subjectgalveston ship channelen_US
dc.titleGalveston Bay Houston Ship Channel project, calculation of project impact, TAMU/ODU oyster population dynamics modelen_US
dc.typeBooken_US
dc.universityen_US
dc.vol-issueen_US

Files