Show simple item record

dc.creatorUrban Engineering
dc.creatorUniversity of Texas Marine Science Institute
dc.creatorSouthwest Research Institute
dc.creatorCoastal Bend Council of Governments
dc.date.accessioned2010-09-02T20:30:33Z
dc.date.available2010-09-02T20:30:33Z
dc.date.issued1977-09
dc.identifier.otherAccession # 10585
dc.identifier.urihttp://hdl.handle.net/1969.3/26997
dc.descriptionApproximately 200 pagesen
dc.description.abstractInterim Report III, "Service Area Delineation for Wastewater Treatment Systems" is one of eleven outputs which must undergo a thorough local review plus a public hearing before it can be submitted to the State for certification. If certified by the Governor, the document can be submitted to the funding agency, the Environmental Protection Agency for final review. The report was prepared by consultants for the Coastal Bend Council of Governmments. It described the existing wastewater collection and treatment facilities in the 208 study area. The purpose in documenting the existing system components was to have a point of departure should expansions or modification by necessary. The maps at the end of this report illustrate the major system components and discharge points. A reduced versionof the area in question is presented first. Then a series of enlargements follow depicting on a larger scale the communities shown on the reduced version.en
dc.language.isoen_USen
dc.publisherCoastal Bend Council of Governmentsen
dc.subjectwastewater treatment facilitiesen
dc.subjectland useen
dc.subjecturban planningen
dc.titleInterim Report III Service Area Delineationen
dc.typeTechnical Reporten
dc.locationGBIC Special Collection
dc.call-noSPEC COLL GBAY ACC#10585


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record