Allens Creek Nuclear Generating Station Site Houston Lighting & Power: Biological Monitoring Program Project Description

dc.acquisition-srcDr. James Baker's Working Collectionen_US
dc.call-noSPEC COLL GBAY ACC#10251
dc.contributor.authorDames & Mooreen_US
dc.date.accessioned2010-02-15T16:47:25Z
dc.date.available2010-02-15T16:47:25Z
dc.date.issuedNovember 1973en_US
dc.description35 pages; available for download at the link below.en_US
dc.description.abstractA biological survey was conducted in the Fall of 1972 to establish baseline conditions of the aquatic and terrestrial ecosystems at the proposed Allens Creek Nuclear Generating Station (ACNGS) site near Sealy, Texas. The results of this survey were submitted in our report dated May 22, 1973 and included in the Environmental Report submitted to the Atomic Energy Commission in August, 1973. Houston Lighting & Power Company has recently authorized a one-year biological monitoring program to be perfomed basically as outlined in Chapter 6 of the Environmental Report. The objective of this project description is to further define the monitoring program. The program defined herein is intended to be flexible to allow adjustment of the dynamic nature of both aquatic and terrestrial ecosystems. Consequently, if data obtained reveal sensitive areas within either system, sampling schedules and techniques can be adjusted to meed these situations.en_US
dc.description.urihttp://gbic.tamug.edu/request.htmen_US
dc.geo-codeHoustonen_US
dc.geo-codeAllens Creek Generating Stationen_US
dc.history2-16-09 ksw; 12-16-10 kswen_US
dc.identifier.urihttp://hdl.handle.net/1969.3/18728
dc.locationAvailable for download at the link below.en_US
dc.locationGBIC Special Collection
dc.placeHouston, TXen_US
dc.publisherDames & Mooreen_US
dc.relation.ispartofseries10251en_US
dc.subjectbiological monitoringen_US
dc.subjectwater qualityen_US
dc.titleAllens Creek Nuclear Generating Station Site Houston Lighting & Power: Biological Monitoring Program Project Descriptionen_US
dc.typeTechnical Reporten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
10251-Biological Monitoring Program Allens Creek Nuclear Generating Station Site for Houston Lighting & Power Company.pdf
Size:
1.99 MB
Format:
Adobe Portable Document Format
Description: