Clear Creek, Texas, flood control: Phase 1, general design memorandum. Draft. Volume 1: Main report and environmental impact statement. Volume 2: Appendices I-X.
dc.acquisition-src | Herman Rudenberg | en_US |
dc.call-no | TC530.C553 1981 v. 1 GBAY | en_US |
dc.call-no | TC530.C553 1981 v. 2 GBAY | en_US |
dc.contract-no | en_US | |
dc.contributor.author | U.S. Army Corps of Engineers, Galveston District | en_US |
dc.contributor.other | en_US | |
dc.date.accessioned | 2010-02-15T17:00:53Z | |
dc.date.available | 2010-02-15T17:00:53Z | |
dc.date.issued | 1981 | en_US |
dc.degree | en_US | |
dc.description | Main report 208 p.; Appendices I-X 505 p. | en_US |
dc.description-other | en_US | |
dc.description.abstract | This design memorandum presents the results of Phase I post authorization planning studies of the Clear Creek, Texas Flood Control project, a channel improvement project authorized in 1968. The objective of these studies have been to evaluate the previous findings and conclusions in light of current conditions and to reaffirm the authorized plan or formulate a suitable alternative. The results of these studies show that any effective plan for flood control on Clear Creek will involve some degree of channel enlargement and reactification. It is recommended that, subject to conditions of local coorperation as outlined in the report, the selected plan of improvement be approved for implementation. | en_US |
dc.description.uri | http://gbic.tamug.edu/request.htm | en_US |
dc.geo-code | Clear Creek | en_US |
dc.geo-code | Houston | en_US |
dc.history | en_US | |
dc.identifier.uri | http://hdl.handle.net/1969.3/20983 | |
dc.latitude | en_US | |
dc.location | GBIC Collection | en_US |
dc.longitude | en_US | |
dc.notes | Final report cited as Acc# 3069 | en_US |
dc.place | Galveston, Texas: | en_US |
dc.publisher | U.S. Army Corps of Engineers, Galveston District | en_US |
dc.relation.ispartofseries | 3173.00 | en_US |
dc.relation.uri | en_US | |
dc.scale | en_US | |
dc.series | en_US | |
dc.subject | water | en_US |
dc.subject | floods | en_US |
dc.subject | flooding | en_US |
dc.subject | flood control | en_US |
dc.subject | flood plains | en_US |
dc.subject | channels | en_US |
dc.subject | environmental impact | en_US |
dc.subject | hydrology | en_US |
dc.subject | natural resources | en_US |
dc.subject | economics | en_US |
dc.subject | rare species | en_US |
dc.subject | endangered species | en_US |
dc.subject | hydraulics | en_US |
dc.subject | cost analysis | en_US |
dc.subject | sociological aspects | en_US |
dc.subject | water management | en_US |
dc.subject | watersheds | en_US |
dc.subject | stream flow | en_US |
dc.title | Clear Creek, Texas, flood control: Phase 1, general design memorandum. Draft. Volume 1: Main report and environmental impact statement. Volume 2: Appendices I-X. | en_US |
dc.type | Book | en_US |
dc.university | en_US | |
dc.vol-issue | en_US |