Renovation of three 108-inch PCCP water pipelines

dc.acquisition-srcDownloaded from-Engineering Village 2en_US
dc.call-noen_US
dc.contract-noen_US
dc.contributor.authorRundle RTen_US
dc.contributor.authorOlden JMen_US
dc.contributor.otheren_US
dc.date.accessioned2010-02-15T17:16:23Z
dc.date.available2010-02-15T17:16:23Z
dc.date.issued1999en_US
dc.degreeen_US
dc.description67-78en_US
dc.description-otheren_US
dc.description.abstractThe Coastal Water Authority of Texas installed three 2740 mm Prestressed Concrete Cylinder Pipe (PCCP) water pipelines across the Houston Ship Channel in 1972. This article describes the investigations leading to the decision to renovate as well as the design and construction of the renovations. Details of the renovations design and construction experience are presenteden_US
dc.description.urihttp://gbic.tamug.edu/request.htmen_US
dc.historyen_US
dc.identifier.urihttp://hdl.handle.net/1969.3/23343
dc.latitudeen_US
dc.locationen_US
dc.longitudeen_US
dc.notesCompilation and indexing terms, Copyright 2004 Elsevier Engineering Information, Incen_US
dc.placeDenver, CO, USAen_US
dc.publisherReston, VA, USAen_US
dc.relation.ispartofseries50946.00en_US
dc.relation.urien_US
dc.scaleen_US
dc.seriesen_US
dc.subjectConstructionen_US
dc.subjectGroutingen_US
dc.subjectInstallationen_US
dc.subjectPipe liningsen_US
dc.subjectPIPELINESen_US
dc.subjectPrestressed concreteen_US
dc.subjectReconstruction (structural)en_US
dc.subjectStructural analysisen_US
dc.subjectTexasen_US
dc.subjectWateren_US
dc.subjectWater pipelinesen_US
dc.subjectWeldingen_US
dc.titleRenovation of three 108-inch PCCP water pipelinesen_US
dc.typeCONFen_US
dc.universityen_US
dc.vol-issue()en_US

Files