Draft environmental impact statement: to construct a deepwater channel and multipurpose terminal near Brownsville

dc.acquisition-srcHerman Rudenbergen_US
dc.call-noTC 187 .D62 1981 GBAYen_US
dc.call-noTC 187 .D62 1981en_US
dc.contract-noen_US
dc.contributor.otheren_US
dc.date.accessioned2010-02-15T17:27:48Z
dc.date.available2010-02-15T17:27:48Z
dc.date.issued1981en_US
dc.degreeen_US
dc.description351 pgs.en_US
dc.description-otheren_US
dc.description.abstractThe Brownsville Navigation District has applied for Department of Army permits for the construction of a deepwater port project which would involve deepening and widening the existing ship channel into the Port of Brownsville to accommodate design vessels of 110,000 DWT and 44,000 DWT in various portions of the ship channel. Proposed multipurpose docks at a deepwater turning basin would provide liquid and dry-bulk offloading capabilities. Onshore support facilities would include a crude oil tank farm, dry bulk terminal, support facilities, and two transportation corridors. This Draft Environmental Impact Statement assesses practical alternative actions. An alternatives evaluation leads to the selection of a preferred project alternative. Discussions of reducing detrimental impacts, including mitigative measures are also presented in the analysis.en_US
dc.description.urihttp://gbic.tamug.edu/request.htmen_US
dc.geo-codeBrowsvilleen_US
dc.geo-codeTexasen_US
dc.geo-codeUnited Statesen_US
dc.history7/20/07 easen_US
dc.identifier.urihttp://hdl.handle.net/1969.3/24978
dc.latitudeen_US
dc.locationGBIC Circulating Collection; TAMUG Circulating Collectionen_US
dc.longitudeen_US
dc.notesDepartment of Army Permit Application no. 13942en_US
dc.placeGalveston, TXen_US
dc.publisherU.S. Army Corps of Engineers, Galveston Districten_US
dc.relation.ispartofseries7070.00en_US
dc.relation.urien_US
dc.scaleen_US
dc.seriesen_US
dc.subjectdredgingen_US
dc.subjectenvironmental aspectsen_US
dc.subjectenvironmental impactsen_US
dc.subjectmarine terminalsen_US
dc.subjectdredging spoilen_US
dc.subjectharborsen_US
dc.subjectenvironmental impact statementsen_US
dc.titleDraft environmental impact statement: to construct a deepwater channel and multipurpose terminal near Brownsvilleen_US
dc.typeBooken_US
dc.universityen_US
dc.vol-issueen_US

Files