2010-11-092010-11-092000-11Accession # 10850http://hdl.handle.net/1969.3/27371158 pages; available for download at the link below.This study was conducted for the U.S. Army Engineer District, Galveston, in the Coastal and Hydraulics Laboratory (CHL) of the Engineer Research and Development Center, (ERDC), Vicksburg, MS, during the period April 1997 through August 1999. During the course of the model study, representatives of the Galveston District and various navigation interests visited ERDC at different times to observe model operations and discuss experiment results. The Galveston District was kept informed of the progress of the study through monthly progress reports, periodic e-mail and telephone conversations, and briefings held during the course of the study.en-USColorado River, Texasnavigation locksGulf Intracoastal WaterwaynavigationNavigation Study, Colorado Locks, Colorado River, Matagorda, TexasTechnical Report