Johnson, Roy B., Jr.Texas Parks & Wildlife Coastal Fisheries Project Reports 19662010-02-152010-02-151966http://hdl.handle.net/1969.3/19903pages 159-168; available for download at the link below.In 1964, preliminary work was completed on a portion of the Hurricane Protection Levee which crossd the mouth of Moses Lake, a protected estuary of the Galveston Bay System. During the three year period from 1964-67 this portion of the Hurricane levee remained incomplete, as a closable tide control and navigation structure has been under construction. During this period, exchange of water between Galveston Bay and Moses Lake has been through a temporary ditch, 155 feet wide and 10-12 feet deep, which was reduced to 35 feet in width in October 1966 after the ditch was closed up during a storm threat. Final procedures in construction will be the opening of the tide structure, and shaping and sodding of the levee.leveesenvironmental effectsecologycoastal engineeringEffects of Engineering Projects on the Ecology of Moses Lake - Effects of Engineering Projects on Galveston Bay EstuariesTechnical Report