Mauk, F.J.2010-02-152010-02-151982http://hdl.handle.net/1969.3/19556104 p.To investigate normal ambient seismicity as well as potentially enhance seismic activity induced by brine production, a seismic monitoring program has been conducted in the vicinity of Chocolote Bayou geopressured test well (the Pleasant Bayou No. 2) since September 1978. The Pleasant Bayou No. 2 well has been completed and perforated at depths of 14,467-14,707 feet (4464.4-44.82.7 m). The brines produce from the Pleasant Bayou No. 2 are reinjected at a depth of 6226-6538 feet (1897.7-1992.8m) in the Pleasant Bayou No. 1 well. The seismic monitoring network and results from January through November 1981 are described.geothermal energyseismologygeologybrinesMicroseismic monitoring of Chocolate Bayou, Texas: The Pleasant Bayou no. 2 geopressured/geothermal energy test well program. 1981 annual progress report.Book