Envirosphere Company2010-02-152010-02-151978http://hdl.handle.net/1969.3/21317179 pgs.This study represents the result of Phase I of a two phase study of impingement at the Cedar Bayou Generating Station Intake Structure A. The purpose of this study is to review and analyze intake A & B impingement monitoring data and to identify and evaluate, from a consideration of engineering, environmental and economic factors, alternative designs or operating strategies having a potential for reducing impingement losses at intak A.water filtersbiologyevaluationpump stationselectric power plantsenvironmental aspectsEvaluation of impingement data and potential impingement reduction alternatives for Cedar Bayou A intakeBook