Final feasibility report and environmental impact statement. Galveston Bay area navigation study. Volume 4: Appendix D - engineering design and costs.
dc.acquisition-src | Jennifer Stengel | en_US |
dc.call-no | TC625.G2 F5 1987 v.4 GBAY | en_US |
dc.call-no | ARCHIVE TC625.G2 F5 1987 v.4 GBAY | en_US |
dc.contract-no | en_US | |
dc.contributor.author | U.S. Army Corps of Engineers, Galveston District. | en_US |
dc.contributor.other | en_US | |
dc.date.accessioned | 2010-02-15T16:58:57Z | |
dc.date.available | 2010-02-15T16:58:57Z | |
dc.date.issued | 1988 | en_US |
dc.degree | en_US | |
dc.description | ARCHIVAL MATERIAL. 286 p. | en_US |
dc.description-other | en_US | |
dc.description.abstract | This appendix presents the results of several engineering investigations. Section 2.0 develops appropriate design criteria for the study area. These criteria are applied to produce a range of possible channel dimensions which are used as input to Plan Formulation (Appendix B). Section 4.0 presents the design details and costs for disposal plan alternatives in the Galveston Bay reach of the HSC, drawing on informaiton developed in other sections of this report. | en_US |
dc.description.uri | http://gbic.tamug.edu/request.htm | en_US |
dc.geo-code | Galveston Bay | en_US |
dc.geo-code | Houston Ship Channel | en_US |
dc.geo-code | Galveston Island | en_US |
dc.geo-code | Galveston Channel | en_US |
dc.geo-code | Texas City Ship Channel | en_US |
dc.geo-code | Bolivar Roads | en_US |
dc.history | en_US | |
dc.identifier.uri | http://hdl.handle.net/1969.3/20664 | |
dc.latitude | en_US | |
dc.location | TAMUG Circulation; GBIC Collection | en_US |
dc.longitude | en_US | |
dc.notes | Call the Galveston Bay office at 409/740-4703 to arrange for use of this archive collection.; This report was published in July 1987 and revised in July 1988. This report is published in six volumes. There are two sets in the Galveston Bay Collection -- one circulating and one archival set. | en_US |
dc.place | Galveston, Texas | en_US |
dc.publisher | U.S. Army Corps of Engineers, Galveston District | en_US |
dc.relation.ispartofseries | 286.00 | en_US |
dc.relation.uri | en_US | |
dc.scale | en_US | |
dc.series | en_US | |
dc.subject | navigational channels | en_US |
dc.subject | legislation | en_US |
dc.subject | environmental impact | en_US |
dc.subject | economic analysis | en_US |
dc.subject | economics | en_US |
dc.subject | cost analysis | en_US |
dc.subject | engineering | en_US |
dc.subject | navigation | en_US |
dc.subject | development projects | en_US |
dc.subject | planning | en_US |
dc.subject | resource development | en_US |
dc.subject | marine transportation | en_US |
dc.subject | channel maintenance | en_US |
dc.title | Final feasibility report and environmental impact statement. Galveston Bay area navigation study. Volume 4: Appendix D - engineering design and costs. | en_US |
dc.type | Book | en_US |
dc.university | en_US | |
dc.vol-issue | en_US |