Trans-Texas Water Program: southeast area: draft technical memorandum: phase II program update

dc.acquisition-srcen_US
dc.call-noTD 224 .T4 P43 1996 GBAYen_US
dc.contract-noen_US
dc.contributor.otheren_US
dc.date.accessioned2010-02-15T17:36:13Z
dc.date.available2010-02-15T17:36:13Z
dc.date.issued1996en_US
dc.degreeen_US
dc.description11 pgs.en_US
dc.description-otheren_US
dc.description.abstractThis report assesses the impact of the new planning information on the conclusions set forth in the original Phase I Report. The Phase I Report concluded that sufficient existing water supplies were present to meet future needs but that those available supplies were not in close proximity to the areas of highest water need. This report focuses on modifications to the Phase II program. These modifications include an increased effort in defining water quality issues associated with Sabine Lake, an increased analysis of the socio-economic impacts of interbasin transfer on exporting and importing basins, and a reduced effort associated with the definition of conceptual interbasin transfer routes from Sabine and Neches River basins.en_US
dc.description.urihttp://gbic.tamug.edu/request.htmen_US
dc.geo-codeTexasen_US
dc.history3/27/06 easen_US
dc.identifier.urihttp://hdl.handle.net/1969.3/26072
dc.latitudeen_US
dc.locationGBIC Circulating Collectionen_US
dc.longitudeen_US
dc.notesSeptember 30, 1996. See also Acc#8996 for phase I report and Acc#8995 for draft Phase II report.en_US
dc.placeHouston, TXen_US
dc.publisherBrown & Root, Inc.en_US
dc.relation.ispartofseries8994.00en_US
dc.relation.urien_US
dc.scaleen_US
dc.seriesen_US
dc.subjectwater supplyen_US
dc.subjectwater resources developmenten_US
dc.subjectwater conservationen_US
dc.titleTrans-Texas Water Program: southeast area: draft technical memorandum: phase II program updateen_US
dc.typeBooken_US
dc.universityen_US
dc.vol-issueen_US

Files