Interim Report III Service Area Delineation
Date
1977-09Author
Urban Engineering
University of Texas Marine Science Institute
Southwest Research Institute
Coastal Bend Council of Governments
Metadata
Show full item recordAbstract
Interim Report III, "Service Area Delineation for Wastewater Treatment Systems" is one of eleven outputs which must undergo a thorough local review plus a public hearing before it can be submitted to the State for certification. If certified by the Governor, the document can be submitted to the funding agency, the Environmental Protection Agency for final review. The report was prepared by consultants for the Coastal Bend Council of Governmments. It described the existing wastewater collection and treatment facilities in the 208 study area. The purpose in documenting the existing system components was to have a point of departure should expansions or modification by necessary. The maps at the end of this report illustrate the major system components and discharge points. A reduced versionof the area in question is presented first. Then a series of enlargements follow depicting on a larger scale the communities shown on the reduced version.