• English
    • español
    • français
    • Deutsch
  • English 
    • English
    • español
    • français
    • Deutsch
  • Login
View Item 
  •   TAMUG DSpace Home
  • Galveston Bay Information Collection
  • Galveston Bay Bibliography
  • View Item
  •   TAMUG DSpace Home
  • Galveston Bay Information Collection
  • Galveston Bay Bibliography
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Effects of Engineering Projects on the Ecology of Moses Lake - Effects of Engineering Projects on Galveston Bay Estuaries

Thumbnail
View/Open
2135-Effects of Engineering Projects on the Ecology of Moses Lakes-Effects of Engineering Projects on Galveston Bay Estuaries.pdf (1.796Mb)
Date
1966
Author
Johnson, Roy B., Jr.
Metadata
Show full item record
Abstract
In 1964, preliminary work was completed on a portion of the Hurricane Protection Levee which crossd the mouth of Moses Lake, a protected estuary of the Galveston Bay System. During the three year period from 1964-67 this portion of the Hurricane levee remained incomplete, as a closable tide control and navigation structure has been under construction. During this period, exchange of water between Galveston Bay and Moses Lake has been through a temporary ditch, 155 feet wide and 10-12 feet deep, which was reduced to 35 feet in width in October 1966 after the ditch was closed up during a storm threat. Final procedures in construction will be the opening of the tide structure, and shaping and sodding of the levee.
URI
http://hdl.handle.net/1969.3/19903
Collections
  • Galveston Bay Bibliography
  • GBIC Full Text

DSpace software copyright © 2002-2016  DuraSpace
Contact Us | Send Feedback
TDL
Theme by 
Atmire NV
 

 

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

Login

DSpace software copyright © 2002-2016  DuraSpace
Contact Us | Send Feedback
TDL
Theme by 
Atmire NV